20′ Banks Fishing Dory, USCG – Floor and Rib Frames

Today I put in 5 1/2 hours building most of the floor and rib frames. Tomorrow I’ll finish up the last 2 that can be secured to the strong back. This process will take some time because each frame needs to be plumbed and level then braced so when the planks are bent and fit they won’t pull the faming out of true.

This entry was posted in Banks Fishing Dory, John Gardner. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.