20′ Banks Fishing Dory, USCG – Getting Started

Today I worked about 3 1/2 hours planing the stock that makes up the floor and the rib frames. Then I cut the keelson limber slots in the floor stock and then started to assemble. This is frame #3. As you cans see Josey’s in fine form check my work! She a great shop dog!!

This entry was posted in Banks Fishing Dory, John Gardner. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.