20′ Banks Fishing Dory, USCG – Installing the Keelson

I just put in a couple of hours this morning. I finished up leveling and bracing the floor frames. I also fit and installed the keelson and then built the mounting bracket for the tombstone transom and then mounted it.

This entry was posted in Banks Fishing Dory, John Gardner. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.