5×10 Devlin Skiff: Stitches Removed

May 8th 2012, worked from 4:30pm-8pm. Today I removed the wire stitches and fare and filled the inside seams. Then glassed all those same seams.

This entry was posted in 5x10 Devlin Skiff, Sam Devlin. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.