Eider: Mast Timber

March 16, 2012; 10:00 am – 2:30 pm; day #73. Today I drilled the mast timber to fit the tabernacle. Then I shaped the fir mast timber to the plan specs and put the first coat of varnish on.

This entry was posted in Eider Sailboat, Sam Devlin. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.