Garvey “Jimbo” – Cutting Panels

Wednesday, I lofted and cut the two bottom and two side panels or planks. I worked from 8 am – 4:30 pm.

This entry was posted in 16' Garvey Skiff - Jimbo, Glen-L Marine Designs. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.