Garvey “Jimbo” – Framing Complete

Monday. Today I spent 6 hour completing the frame work. I’m waiting on the owner to let me know if the motor he plans on getting will be a long shaft or short. Once I get that info I can finish up the motor well.

I also added a photo of this morning sunrise. It was 28 degrees this morning with frost on the beach.

This entry was posted in 16' Garvey Skiff - Jimbo, Glen-L Marine Designs. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.