Marina – Downspouts and Gutters

The last few days I installed the 4″ drain piping for the downspouts and the 4″ French drain piping as well. Two days ago my neighbor Arvid installed the gutters and downspouts. To button this project up for the winter, the garage doors need installation, which should happen within the next week or so. Also the whole project needs to be back filled.

This entry was posted in Columbia River, Puget Island Marina and Campground. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.