Marina – Finishing the First Floor

The last few days I’ve been finishing up the first level. All the blocking is done along with cutting the stair runners and fitting one side with 2×4 temporary treads. The second level has been decked with 3/4″ T&G plywood so now I move up stairs and begin building walls.

This entry was posted in Columbia River, Puget Island Marina and Campground. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.