Pelicano 18 – Coordination

Today was a busy day of coordination. After making templates for the windshield safety glass, I drove to Longview, Washington, dropped off the cuddy cabin foam for the cushions to Longview Upholstery and dropped off the glass template to Twin City Glass.

I then connected with the canvas guy who followed me back to the boat shop to take measurements for the canvas/drop curtain, met with Shawn the motor guy at his shop.

After all of that I sanded all the wood that will be varnished. I then built the console for the steering, tac and 12v electrical panel.

This entry was posted in Pelicano 18 - Devlin Design. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.