Pelicano 18 – Layout

Today, I worked on the lofting layout of the two side panels. You can also see the bottom chine and the top sheer. I then will set these aside and stage the next sheet of 1/2″ plywood and the simply trace the two freshly cut panel onto the staged sheet. Started about 5:15 pm and ended at 8:45 pm.

This entry was posted in Pelicano 18 - Devlin Design. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.