Pelicano 18 – Set Up Strongback

Today, I set up the strongback to support the bulkheads. I was also able to set bulkheads one through three. Started at 11:00 am and ended at 5:00 pm.

This entry was posted in Pelicano 18 - Devlin Design. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.