Pelicano 18 – Set Up Strongback

Today, I set up the strongback to support the bulkheads. I was also able to set bulkheads one through three. Started at 11:00 am and ended at 5:00 pm.

This entry was posted in Pelicano 18 - Devlin Design. Bookmark the permalink. Both comments and trackbacks are currently closed.