20′ Banks Fishing Dory, USCG – Plywood Bottom

Today I put in 4 1/2 hours. I started cleaning up the squeezed out dried glue from the fitting of the sheer planks. Then I cut and fit the 1/2″ marine plywood bottom. Tomorrow I will plane the bottom fair with the hull chine and then fiberglass tape the chine and seams.

This entry was posted in Banks Fishing Dory, John Gardner. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.