Polliwog 2012: Prepping the Hull

Tuesday, today I spent 4 hours prepping the hull and covering it with 2 layers of 6oz glass cloth. Then saturating the cloth with MAS epoxy. Later this evening I will fix the skeg.

This entry was posted in Polliwog 7.5 - Sam Devlin Design, Sam Devlin. Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

You must be logged in to post a comment.